The Expectation
General Kinetics received an urgent request from the customer’s lead suspension Engineer looking for help in resolving a roll stiffness issue that became apparent when additional armour was added to the vehicle cab. As the Tier 1 supplier of the damping systems for our customer, General Kinetics was their first and only call for assistance.
The Solution
Due to the nature of the request and the fact that without the armoured vehicles, soldiers were in peril, all available resources were brought to bear. The roll stiffness issue proposed to the customer was the addition of a spring function to a much larger damper that had not before been mated to that particular vehicle. The damping rate was increased which, with the addition of a concentric spring element, restored the original ride height and mobility, and provided additional roll resistance to offset the added weight and momentum of the armour.
Results & Benefits
Within one week of receiving the request, the General Kinetics engineering team modified the design of an existing shock absorber to include a significant load-carrying spring element, adapted it to fit the customer’s vehicle, and supplied samples for test-fitting. Within two weeks, production-like prototype dampers were on the way to the customer for field validation. Series production began 4 weeks later upon receipt of new material from our supply base, and the customer met their technical and delivery challenges in getting a more protected vehicle into the field.
Feedback from soldiers in the user community was immediate and positive, as among others, we received a first-person report from a Sergeant returning from a deployment, who had been a vehicle commander in one of the newly-armoured trucks and he offered that the added armour had “saved his ass in Iraq”.
Any questions to our company?
You are more than welcome to explore our website. In case you have any questions and demands in regard to our company, get in touch and send us an email.